Equipment at a glance
Two-channel architecture, functions, front-panel terminology and links to the full guide. Use your browser’s Print / Save PDF command for a shareable copy.
Choose the document for your task: learn the equipment, programme a heating profile, follow the controlled procedure, or service the electrical system. Current reference documents are distinguished from unapproved commissioning records and historical design issues.
Best for visitors, customers, new operators and colleagues learning the instrument.
Two-channel architecture, functions, front-panel terminology and links to the full guide. Use your browser’s Print / Save PDF command for a shareable copy.
Numbered front-panel controls, panel markings, indications and electrical overview.
Complete 23-step experiment, shutdown and fault-response checklist, with expected states.
18-hazard register, specimen-specific controls, inspection evidence and approval fields. Must be locally reviewed before live use.
Use the planning and training tools offline; physical settings always need controller verification.
Plan rate-of-rise profiles, view commanded setpoint graphs, generate entry instructions and practise using a virtual Omron keypad.
Open Programme Studio →Follow every button press for a ramp-and-soak example or select a saved programme.
Open guided steps →Controller operation, worked fixed-temperature and ramp examples, input configuration and tuning precautions.
Open full guide →Search the Omron menu hierarchy and read about the Windows USB connection workflow, limitations and hardware-specific parameters.
Reference issue R1.2. These are technical reference documents, not a signed as-built inspection certificate.
Mains, 24 V controls, both heater channels, terminal allocations and component references. Known meter-input omissions are called out on the drawing page.
Searchable and printable point-to-point schedule for documented control and heater circuits. Does not include meter input branches.
Open 70-route schedule →48 allocated terminal positions and 24 reference component entries, with manufacturer documentation links.
Confirmed absent external fuses on PV1/PV2, Murata requirements and the pending installation/acceptance record.
Read notice and acceptance fields →| Document | Issue | Status / permitted use |
|---|---|---|
| User manual, programming and equipment overview | Web documentation · 9 Nov 2026 | Operator and training reference; site authorisation still required for live heating |
| Electrical diagrams, PDF and editable PowerPoint | R1.2 · 26 Oct 2026 | Current reference design, not signed as-built; PV1/PV2 branches omitted |
| From–Via–To and terminal allocations | R1.2 | Controlled reference schedule; 70 documented routes and 48 allocated ports |
| Operating procedure | SOP-R1.2 | Procedure format available; live use subject to equipment and site release |
| Equipment risk assessment | RA-R1.1 | Draft · local review and signatures required |
| Meter input protection | PV-FUSE-01 | Open corrective action · neither external fuse fitted |
| Historical drawings and development tests | D12/D13 and earlier | Engineering archive only; not current service instruction |