Check permission and test plan
Have a test ID, authorised specimen/fixture, maximum temperature, heating rate, duration, cooling arrangement and sample-specific risk controls. Confirm that the outstanding Murata PV1/PV2 input-wiring protection issue has been formally closed and the equipment released for this test.