Set up a two-segment ramp-and-soak example or select a stored programme. The instructions update when you change the programme number, target, rate or hold time.
Before using a real controller: isolate the external heater supply and follow the approved equipment procedure. The controller must be in RESET before editing. This guide cannot read, verify or change hardware and does not authorise heater operation. The worked ramp example assumes Type K input 6 (−20.0 to 500.0 °C) with rate-of-rise programming.
Create ramp + soakStep 1 of 19
Before editing
Check the controller
PV/SP
Expected display
Button action / check
Show the full procedure (19 steps)
This list is for an isolated setup, not a commissioning certificate or permission to energise a heater.